Electric metering with the XTender

The seed or fertiliser is metered by the electrically-driven metering unit underneath the seed hopper. Since the metering system is located right at the front under the hopper, it is easy to reach and enables quick and easy exchange of the metering cassettes - different metering cassettes are available for various seed types and fertilisers. The electrically driven metering system enables easy adjustment of the seed rate from the tractor cab, pre-metering in field corners and calibration at the touch of a button. Alternatively, the metering can be controlled fully automatically by application maps.

Related links

Here you will find further information on cultivation

Are you interested?

Provide us your contact details* and we will get back to you:
* Your contact details will only be used to contact you as requested.